Home » ESD Consultants Pillar Page
ESD Consultants: What ESD Means, When You Need an ESD Report, and How to Get It Approved
Most projects meet ESD the same way: a pre-lodgement note, a council condition, or a request for information asking the applicant to “demonstrate ecologically sustainable development”. This guide explains what ESD actually means in Australian planning law, what an ESD consultant does, what goes into an ESD report, how requirements change between states and councils, and what the work costs.
It is written by the Torple Enviro assessment team, who prepare ESD, Section J, NatHERS and BASIX documentation for residential and commercial projects across Australia. If you already know you need a report, speak to an ESD consultant or jump to ESD consultancy services.


15+
7,800+
3 KEY AREAS
Table of Contents
- 01What is ESD? (Ecologically Sustainable Development)
- 02What Does an ESD Consultant Do?
- 03The Core Principles of ESD
- 04What is an ESD Report?
- 05When Do You Need an ESD Consultant?
- 06ESD Requirements by State and Council
- 07ESD Rating Tools, Frameworks and Related Assessments
- 08ESD Consultancy Services at Torple Enviro
- 09The ESD Report Process, Step by Step
- 10What's Included in an ESD Report
- 11ESD Consultant Cost and Turnaround
- 12How to Choose an ESD Consultant
- 13Common ESD Report Mistakes and Council RFIs
- 14Frequently Asked Questions About ESD
What is ESD? (Ecologically Sustainable Development)
QUICK ANSWER
ESD stands for Ecologically Sustainable Development. In Australian law it means using, conserving and enhancing the community’s resources so that the ecological processes life depends on are maintained, and quality of life can increase now and in the future. In building and planning, applicants demonstrate ESD through an ESD report lodged with a development application.
What does ESD stand for?
ESD stands for Ecologically Sustainable Development. That is the term used in Commonwealth and state legislation. In the building industry you will also see ESD expanded as Environmentally Sustainable Design, particularly in Victorian council policies council policies. The two are closely linked: Ecologically Sustainable Development is the policy objective, and Environmentally Sustainable Design is how a building delivers it through energy, water, materials and indoor environment decisions.
ESD in the Australian planning context
The term entered Australian policy in 1992, through the Intergovernmental Agreement on the Environment and the National Strategy for Ecologically Sustainable Development, endorsed by the Council of Australian Governments in December 1992. It is now written into the objects of major environmental and planning laws, including the EPBC Act 1999 administered by DCCEEW, and in New South Wales the Environmental Planning and Assessment Act 1979, whose objects include facilitating ecologically sustainable development.
In practice, consent authorities apply ESD at the development application stage. Council planning schemes, development control plans and state instruments turn the broad principle into measurable requirements, such as energy targets, water efficiency, stormwater treatment and waste management.
ESD vs sustainability: what the terms actually mean
“Sustainability” is a general aspiration with no fixed test. ESD is a defined legal concept with specific principles that decision-makers must consider. For a building project, that difference matters: a council will not accept a statement that a design is “sustainable”, but it will assess whether the proposal meets its ESD policy targets, scored with recognised tools and shown on the drawings.
Who is required to demonstrate ESD?
Applicants for development approval are required to demonstrate ESD where a council policy, planning scheme clause or state instrument triggers it. That commonly includes multi-dwelling residential, apartments, mixed-use, commercial, industrial, education, health and state significant development. Single dwellings are usually covered by separate residential tools, such as BASIX in NSW or NatHERS elsewhere, rather than a full ESD report.
What Does an ESD Consultant Do?
A BASIX certificate is the formal compliance document issued by the NSW Planning Portal confirming that a proposed residential development meets the BASIX sustainability targets. It is required to accompany every Development Application or Complying Development Certificate for a new home or major renovation anywhere in NSW.
BASIX Compliance Certificate vs BASIX Certificate
These two terms are used interchangeably in industry conversation, but there is only one document: the BASIX certificate. It is issued after the applicant completes the online BASIX assessment via the NSW Planning Portal BASIX tool, and only once all three targets – water, energy, and thermal comfort – have been met.
No council and no private certifier issues the BASIX certificate. It is self-generated through the online tool, subject to the commitments the applicant agrees to honour throughout construction.Those commitments – fixture types, insulation levels, hot water systems, and so on – are what the building certifier later verifies on site.
What Triggers the Need for a BASIX Certificate
QUICK ANSWER
An ESD consultant is a building sustainability specialist who assesses a proposed development against ESD policy, council conditions and rating tools, then documents the design commitments in an ESD report. They advise the design team on energy, water, materials, transport and indoor environment measures, and respond to council requests for information until approval.
When an ESD consultant joins a project
The best time is concept or schematic design, before the development application is lodged. At that stage an ESD consultant can influence orientation, glazing ratios, shading, services selection and rainwater reuse at low cost. Engaged after lodgement, the same consultant is usually limited to documenting what is already designed, or negotiating with council over shortfalls.
What an ESD consultant delivers
- Design-stage advice on passive design, energy, water, materials and indoor environment quality.
- Sustainability modelling and calculations, such as BESS, daylight, thermal comfort, stormwater (STORM or MUSIC) and energy estimates.
- The ESD report itself (or a Sustainable Design Assessment or Sustainability Management Plan, depending on the council).
- Drawing mark-ups so every ESD commitment appears on the architectural set.
- Council liaison and written responses to requests for information (RFIs).
- Post-approval verification or post-construction reports, where a condition of consent requires them.
Who an ESD consultant works with
An ESD consultant sits inside the design team: the architect, mechanical, electrical and hydraulic engineers, the landscape architect, the town planner lodging the application, and the council’s ESD officer. Government guidance such as Your Home, Australia’s guide to sustainable homes, sets out many of the passive design principles consultants draw on.
What an ESD consultant does not do
- They are not the certifier. Building approval sits with a registered building surveyor or certifier.
- They are not the council’s assessor. The council ESD officer reviews the report; the consultant prepares it.
- They are not automatically a Section J assessor. Section J energy compliance is a separate NCC assessment at building approval stage, though many firms, including Torple, provide both.
- They do not guarantee as-built performance. Operational ratings such as NABERS measure the finished building in use.
See our ESD report service, or our SDA and SMP reports for commercial developments.
The Core Principles of ESD
QUICK ANSWER
The principles of ESD are set out in section 3A of the EPBC Act 1999: integrating economic, environmental, social and equitable considerations; the precautionary principle; intergenerational equity; conserving biological diversity and ecological integrity; and improved valuation, pricing and incentive mechanisms. Many state laws list the last four as “the four principles of ESD”.
The statutory wording is in section 3A of the EPBC Act. New South Wales lists the four core principles in the Protection of the Environment Administration Act 1991, and the NSW EPA applies them in its regulatory decisions. Here is what each one means for a building project.
1. Integration of economic, environmental and social considerations
Decisions should weigh long-term and short-term economic, environmental, social and equitable factors together, rather than trading one off in isolation. Project example: a Sydney apartment developer compares the upfront cost of heat-pump hot water with 30 years of lower running costs for residents, rather than choosing on capital cost alone.
2. The precautionary principle
Where there is a threat of serious or irreversible environmental damage, a lack of full scientific certainty is not a reason to postpone measures that prevent it. Project example: a Brisbane mixed-use development near a flood-prone creek adopts conservative stormwater detention and water sensitive urban design, even where downstream impacts are hard to model precisely.
3. Intergenerational equity
The present generation should maintain or improve the health, diversity and productivity of the environment for future generations. Project example: a Melbourne townhouse project specifies all-electric services and solar PV so the building can run on renewable energy as the grid decarbonises, instead of locking in gas for decades.
4. Conservation of biological diversity and ecological integrity
Protecting biodiversity and ecological integrity should be a fundamental consideration in decision-making. Project example: a regional Victorian subdivision retains remnant native trees, uses indigenous landscaping and avoids light spill onto an adjoining habitat corridor.
5. Improved valuation, pricing and incentive mechanisms
Environmental costs should be reflected in the price of goods and services, so that those who generate pollution or waste bear its cost. Project example: a commercial office in Adelaide adopts a construction waste management plan with recycling targets, because landfill levies make waste a real project cost.
How the principles translate to a real project
Councils rarely ask you to quote the principles. They ask you to meet targets that put them into practice. The table below shows the link.
| ESD principle | Plain-English meaning | How it shows up in an ESD report |
|---|---|---|
| Integration | Weigh cost, environment and people together | Life-cycle cost notes, balanced initiative selection |
| Precautionary principle | Act on serious risk without waiting for certainty | Stormwater, flood and climate resilience measures |
| Intergenerational equity | Leave the environment no worse for the future | Energy efficiency, all-electric services, renewables |
| Biodiversity and ecological integrity | Protect habitat and ecosystems | Landscaping, tree retention, urban ecology credits |
| Valuation, pricing and incentives | Polluters and waste generators pay | Waste management plans, materials and embodied emissions |
What is an ESD Report?
QUICK ANSWER
An ESD report is a planning-stage document that shows how a proposed development meets the sustainability requirements of the consent authority. It sets targets for energy, water, stormwater, materials, waste, transport and indoor environment quality, commits the design to specific measures, and becomes part of the approved plans through conditions of consent.
What an ESD report contains
A typical report includes a project description, the applicable planning controls, targets for each ESD category, the design initiatives proposed to meet them, supporting tool outputs (for example BESS, STORM or MUSIC, or preliminary NatHERS ratings), and a compliance table cross-referenced to the drawings. The full checklist is in What’s included in an ESD report.
Who prepares an ESD report
ESD reports are prepared by ESD or sustainability consultants, often with input from services engineers. For smaller developments, some councils accept a self-prepared assessment using their free online tool, but most multi-residential and commercial applicants engage a consultant to avoid RFIs.
ESD report vs ESD statement vs SMP
| Document | Typical use | Level of detail |
|---|---|---|
| ESD statement | Small projects or councils with a short-form requirement | Brief list of commitments, often a few pages |
| Sustainable Design Assessment (SDA) | Victorian small to medium developments | Tool-based (usually BESS) with annotated drawings |
| ESD report | General term used nationally for the planning-stage sustainability document | Full targets, initiatives, modelling and compliance table |
| Sustainability Management Plan (SMP) | Victorian larger developments | Most detailed: modelling, implementation schedule, often post-construction verification |
Thresholds between an SDA and an SMP vary by council, so always check the local policy before scoping.
Where the ESD report sits in a DA submission
The ESD report is lodged with the development application alongside the architectural plans, statement of environmental effects, stormwater plan and, in NSW residential projects, the BASIX certificate. Lodgement requirements are listed on the NSW Planning Portal and equivalent state portals. Once approved, conditions of consent usually require the development to be built in accordance with the report, so every commitment must be realistic.
Ready to lodge? Get an ESD report prepared.
When Do You Need an ESD Consultant?
QUICK ANSWER
You need an ESD consultant when a council policy, planning scheme or state instrument requires a sustainability assessment with your development application, typically for multi-dwelling residential, apartments, mixed-use, commercial and larger non-residential projects. The right time to engage one is concept design, before lodgement, not after an RFI or refusal.
Project types that require an ESD report
- Multi-dwelling residential, townhouses and apartment buildings (NCC Class 1a groups and Class 2).
- Mixed-use developments combining retail, office and residential.
- Commercial offices, retail, hotels and serviced apartments (Class 3, 5 and 6).
- Industrial, warehouse and logistics buildings above council thresholds (Class 7 and 8).
- Education, health, aged care and community buildings (Class 9).
- Major commercial fitouts and alterations where council policy applies.
Council triggers and thresholds
Triggers are set locally and vary. Common ones are the number of dwellings, gross floor area of non-residential space, capital investment value and zone. In NSW, for example, the Sustainable Buildings SEPP applies to new non-residential development of $5 million or more. Building classes are defined in the National Construction Code.
Do I need an ESD consultant? A quick decision list
- Has council, a pre-lodgement meeting or a planning consultant mentioned ESD, an SDA or an SMP? Yes: engage now.
- Is the project two or more dwellings, or non-residential above a few hundred square metres? Probably: check the local policy.
- Is it a single new house in NSW? Usually BASIX only, not an ESD report.
- Has council issued an RFI about sustainability? Yes: engage immediately to protect your assessment timeline.
At what stage to engage a consultant
Engage at concept design. Our practitioner experience is consistent: an ESD consultant brought in before drawings are fixed usually finds compliant, low-cost solutions; one brought in after an RFI is often working around decisions that are expensive to reverse. Our guide to SDA and SMP reports explains how early input lifts council scores.
What happens if ESD is not addressed
An application lodged without adequate ESD information can be held up by an RFI, deferred, conditioned with costly additional requirements, or refused. Redesign after lodgement can also trigger re-notification. Torple’s free consultation can confirm what your council requires before you lodge.
ESD Requirements by State and Council
QUICK ANSWER
ESD requirements are set by each state’s planning system and by individual councils, so there is no single national ESD report standard. NSW relies on the Sustainable Buildings SEPP and BASIX, Victoria on planning scheme ESD policy assessed with BESS, and other states on local planning schemes and the National Construction Code.
| New South Wales | SEPP (Sustainable Buildings) 2022; council DCPs | BASIX (residential); NABERS Embodied Emissions Materials Form and NABERS commitment agreements (non-residential) | All new homes; non-residential $5M+ new or $10M+ alterations |
|---|---|---|---|
| Victoria | Clause 15.01-2S and local ESD policies (Clause 15.01-2L) | BESS, STORM or MUSIC, Green Star | Multi-dwelling and non-residential above council thresholds (e.g. Merri-bek, Moonee Valley, Wyndham, Bayside) |
| Queensland | Local planning schemes (e.g. Brisbane City Plan 2014); Queensland Development Code | NatHERS, Section J, Green Star (by policy) | Council-specific; larger commercial and government projects |
| South Australia | Planning and Design Code (PlanSA) | NatHERS, Section J, Green Star | Policy-specific overlays; larger developments |
| Western Australia | State planning policies and R-Codes; local policies | NatHERS, Section J, Green Star | Council-specific (e.g. City of Fremantle) |
| Tasmania and ACT | Tasmanian Planning Scheme; ACT Territory Plan | NatHERS, Section J, ACT sustainability requirements | Development-specific |
New South Wales
The Sustainable Buildings SEPP commenced on 1 October 2023. For residential development it carries forward BASIX, including higher thermal and energy targets and a materials index. For non-residential development it applies to new buildings of $5 million or more and alterations of $10 million or more, requiring general sustainability considerations and embodied emissions reporting. Large commercial development (offices over 1,000 m² net lettable area, and hotels, motels or serviced apartments with 100 or more rooms) must also meet NABERS-aligned energy and water standards. Many councils, such as the City of Sydney, add DCP controls. For residential certificates, see our BASIX certificate requirements guide.
Victoria
Victoria’s planning schemes embed ESD in Clause 15.01-2S, and many metropolitan and regional councils have local ESD policies, now generally at Clause 15.01-2L. These typically require a Sustainable Design Assessment for smaller developments and a Sustainability Management Plan for larger ones, usually assessed with BESS, the Built Environment Sustainability Scorecard developed by councils. Torple prepares BESS assessments and SDA and SMP reports for Victorian councils. One recent change matters: following Amendment VC267 (March 2025), some councils note that developments assessed under Clause 55 (two or more dwellings, up to three storeys) can no longer be assessed against local ESD policy. Check the current position with Planning Victoria and the council before scoping.
Queensland
Queensland has no statewide ESD report requirement. Sustainability expectations come through local planning schemes, government building policy and the NCC energy efficiency provisions applied through the Queensland Development Code. Commercial and government projects often commit to Green Star or NABERS targets.
South Australia, Western Australia and Tasmania
These states rely mainly on the NCC for energy efficiency, with local policies adding requirements for larger developments. Some councils publish their own ESD guidance, so check before lodgement.
How council requirements differ from national codes
The NCC sets minimum building performance, checked at building approval. Council ESD policy applies earlier, at planning stage, and can ask for more than the NCC minimum, such as rainwater reuse, EV readiness, bicycle parking or higher energy scores. The NCC itself is also changing: NCC 2025 was released on 1 May 2026, with states adopting it on their own timelines (NSW from 1 May 2027). It keeps the 7-star residential minimum from NCC 2022 and tightens commercial energy efficiency, including on-site solar requirements.
ESD Rating Tools, Frameworks and Related Assessments
QUICK ANSWER
An ESD report usually draws on several rating tools. Green Star and NABERS rate whole-building sustainability and operational performance, BESS scores council planning applications in Victoria, Section J and J1V3 cover commercial energy compliance under the NCC, and NatHERS and Whole of Home rate residential energy performance.
| Framework | What it measures | Building types | When required |
|---|---|---|---|
| Green Star (GBCA) | Holistic sustainability across energy, water, materials, IEQ, transport, innovation | Commercial, residential, communities, fitouts | Voluntary, or by policy, funding or tenant requirement |
| NABERS | Measured operational energy, water, waste, IEQ; embodied emissions | Offices, hotels, apartments, shopping centres and others | Commitment agreements in NSW large commercial; mandatory disclosure for large offices |
| BESS | Planning-stage sustainability score across ten categories | Residential and non-residential in participating Victorian councils | Council ESD policy at planning permit stage |
| Section J (NCC Vol. One) | Building fabric, glazing, services and energy efficiency | Class 2 common areas and Class 3, 5 to 9 | Building approval for all relevant new work |
| J1V3 (verification method) | Modelled performance against an NCC reference building | Commercial buildings using a Performance Solution | When Deemed-to-Satisfy is too restrictive |
| NatHERS | Thermal performance star rating (0 to 10 stars) | Class 1 and Class 2 dwellings | Residential energy compliance; 7-star minimum under NCC 2022 |
| Whole of Home | Annual energy use of fixed appliances, offset by solar | Class 1 and Class 2 dwellings | NCC 2022 residential energy requirement |
Green Star and NABERS
Green Star, run by the Green Building Council of Australia, rates the sustainability of a building’s design, construction and operation. NABERS rates the measured, real-world performance of a building once occupied. Many ESD reports for commercial projects commit to a Green Star rating or a NABERS target as the headline outcome. Torple supports Green Star ratings; our explainer on measuring sustainability with Green Star and modern assessment tools covers how they compare.
BESS and state scorecards
BESS is a free online tool used by participating Victorian councils to assess sustainability at planning permit stage. It scores energy, water, stormwater, IEQ, transport, waste, materials, urban ecology, innovation and management. Councils typically expect a best-practice score, often 50% or more. See our commercial BESS assessments.
Section J and J1V3 for commercial buildings
Section J of NCC Volume One sets energy efficiency requirements for commercial buildings and Class 2 common areas. Compliance is shown by Deemed-to-Satisfy provisions or by modelling under the J1V3 verification method (known as JV3 before NCC 2022). Section J is assessed at building approval, after the ESD report has done its job at planning. See our Section J assessments, JV3/J1V3 performance solutions, the complete guide to commercial Section J, or our dedicated Section J report site.
NatHERS and Whole of Home for residential
NatHERS rates the thermal performance of a home’s design out of 10 stars, and NCC 2022 set a 7-star minimum in most jurisdictions. Whole of Home adds an annual energy budget for heating, cooling, hot water, lighting and pool equipment. Torple provides NatHERS assessments and Whole of Home assessments for new homes and apartments.
How these fit together on one project
On a typical Melbourne mixed-use building, BESS supports the SMP at planning permit, NatHERS and Whole of Home cover the apartments and Section J covers the ground-floor retail at building permit, a Green Star rating may be targeted for marketing or finance, and NABERS measures the building once occupied. One consultant coordinating all of these avoids conflicting assumptions between reports.
ESD Consultancy Services at Torple Enviro
QUICK ANSWER
Torple Enviro provides ESD consultancy services for residential, multi-residential and commercial developments across Australia, including ESD reports, Sustainable Design Assessments, Sustainability Management Plans, BESS assessments and council RFI responses. We coordinate ESD with Section J, NatHERS and BASIX so every report on your project uses the same inputs.
Our ESD consultancy services
- ESD reports and ESD statements for development applications.
- Sustainable Design Assessments (SDA) and Sustainability Management Plans (SMP) for Victorian councils.
- BESS, STORM and MUSIC assessments.
- Daylight, thermal comfort and energy modelling to support targets.
- Council RFI responses and ESD officer liaison.
- Post-construction ESD verification reports.
- Integrated Section J, J1V3, NatHERS, Whole of Home and BASIX compliance.
Project types and building classes we cover
Class 1 townhouse groups, Class 2 apartments, Class 3 hotels and serviced apartments, Class 5 offices, Class 6 retail, Class 7 and 8 warehouses and industrial buildings, and Class 9 education, health and aged care. Torple has more than 15 years of practice and 7,800+ completed projects.
States and councils we work across
New South Wales, Victoria, Queensland, South Australia, Western Australia, Tasmania and the ACT, with offices in Victoria (Narre Warren South), Tasmania (Launceston) and New South Wales.
Our accreditations and team
The team is led by Tehzoon JK (Managing Director), with thermal performance assessors and sustainability consultants. Torple won two 2025 Building Designers Association of Australia (BDAA) national awards for energy efficiency.
Recent ESD projects
- Medical centre, Princes Highway, Victoria (Class 5): Sustainable Design Assessment at planning stage plus NCC 2022 Section J compliance.
- Mixed-use development, Canadian Bay, Victoria: SDA at planning stage, NCC 2022 Part H6 energy efficiency via VURB, and Whole of Home.
Planning a DA? Book a free consultation with an ESD consultant, or see our ESD report service and commercial SDA and SMP reports.
The ESD Report Process, Step by Step
QUICK ANSWER
Preparing an ESD report follows six stages: brief and drawings, preliminary assessment, modelling and calculations, draft report, design-team review, and council-ready issue. With complete drawings, most reports are issued within [5 to 15 business days]. Incomplete drawings and late design changes are the most common causes of delay.
| Step | What happens | Indicative duration | What we need from you |
|---|---|---|---|
| 1. Brief and drawings | We confirm the council, applicable policy and scope | [1 day] | Architectural drawings, site address, development description |
| 2. Preliminary assessment | We identify targets and flag design gaps early | [1 to 2 days] | Services concepts, landscape plan if available |
| 3. Modelling and calculations | BESS, stormwater, daylight or energy modelling as required | [2 to 5 days] | Glazing, wall and roof specifications; services selections |
| 4. Draft report | Full report with compliance table and drawing mark-ups | [2 to 3 days] | Nothing: we prepare it |
| 5. Client and design-team review | You and your architect confirm every commitment is buildable | [Your timing] | Comments in one consolidated round |
| 6. Council-ready issue | Final report and annotated drawings for lodgement | [1 day] | Final drawing set matching the report |
What causes delays: drawings that change after modelling, missing specifications for glazing or services, and several rounds of scattered comments. A single frozen drawing set and one consolidated review round is the fastest route to lodgement. Contact us to start.
What's Included in an ESD Report
QUICK ANSWER
A council-ready ESD report covers energy efficiency, water efficiency and stormwater, materials and waste, transport, indoor environment quality and urban ecology, with each commitment linked to a target and shown on the drawings. It ends with a compliance summary table mapping every council requirement to the proposed initiative and its evidence.
Energy efficiency
- Thermal performance targets (NatHERS for dwellings, Section J approach for non-residential), aligned with NCC energy efficiency provisions.
- Heating, cooling and hot water systems, efficient lighting and controls.
- Solar PV, all-electric services and EV charging readiness where required.
Water efficiency and stormwater
- WELS-rated fixtures and fittings.
- Rainwater harvesting and reuse for toilets, laundry and irrigation.
- Stormwater quality treatment demonstrated with STORM or MUSIC (see our STORM and WSUD assessments).
Materials, waste and transport
- Material selection, recycled content and embodied emissions where required.
- Construction and operational waste management, including bin storage and recycling.
- Bicycle parking, end-of-trip facilities, public transport access and car share.
Indoor environment quality
- Daylight access to living areas and workspaces.
- Natural ventilation and cross-ventilation.
- Low-VOC materials, thermal comfort and external shading.
The compliance summary table
Every Torple ESD report ends with a table like this, so the council ESD officer can check each requirement in one place:
| Council requirement | Target | Proposed initiative | Evidence | Drawing ref. |
|---|---|---|---|---|
| Energy efficiency | Best-practice BESS energy score | Heat-pump hot water, 5 kW solar PV | BESS report | TP-201 |
| Stormwater | STORM score of 100% | 10,000 L rainwater tank reused for toilets | STORM report | TP-101 |
| Daylight | Living areas meet council daylight standard | Glazing to north and east, light wells | Daylight calculation | TP-301 |
See our ESD report service for scope and pricing.
ESD Consultant Cost and Turnaround
QUICK ANSWER
In Australia, an ESD report typically costs [A$1,500 to A$4,000] for a small multi-dwelling project, [A$4,000 to A$10,000] for a medium apartment or mixed-use development, and [A$10,000 or more] for large commercial projects needing detailed modelling. Most reports take [5 to 15 business days] from complete drawings.
| Cost driver | Why it changes the fee |
|---|---|
| Project scale | More dwellings or floor area means more inputs, modelling and drawing mark-ups |
| Building class and mix | Mixed-use projects need both residential and non-residential assessment |
| Council requirements | An SMP with modelling costs more than a tool-based SDA or short ESD statement |
| Modelling required | Daylight, energy or J1V3 modelling adds specialist time |
| Revision rounds | Design changes after modelling mean re-running assessments |
| RFI responses | Complex council RFIs can require additional analysis |
Indicative cost ranges by project type
| Project type | Typical document | Indicative fee (ex GST) |
|---|---|---|
| 2 to 9 dwellings | ESD statement or SDA | [A$1,500 to A$4,000 |
| 10 to 50 apartments or mixed-use | ESD report or SMP | [A$4,000 to A$10,000] |
| Large commercial, education or health | ESD report or SMP with modelling | [A$10,000+] |
Typical turnaround times
[5 to 7 business days] for small projects and [10 to 15 business days] for larger ones, measured from receipt of complete drawings. Urgent turnaround is available on request.
What is included in the fee
A standard Torple fee covers the assessment, tool reports, the ESD report, drawing mark-ups, [one round of revisions] and [one council RFI response]. Post-construction verification, extra design iterations and separate Section J or NatHERS assessments are quoted separately. Request a fixed-fee quote.
How to Choose an ESD Consultant
QUICK ANSWER
Choose an ESD consultant who holds relevant tool accreditations, has recent approvals with your specific council, can do the modelling your project needs in-house, and gives a written scope that states revision rounds, RFI responses and turnaround. Be cautious of unusually low fees that exclude council RFI responses.
What qualifications should an ESD consultant hold?
There is no single national licence for ESD consultants, so look for relevant qualifications (environmental, building or engineering disciplines) and tool accreditations that match your project, such as NatHERS accreditation, Green Star Accredited Professional status or NABERS accreditation. Ask who will actually prepare and sign the report.
Does council experience matter?
Yes. Council ESD policies, preferred tools and expectations differ, even between neighbouring councils. A consultant who has recently had reports approved by your council will know which initiatives its ESD officer expects and how to avoid the common RFIs.
What should be in the scope of works?
- The documents to be delivered (ESD report, SDA, SMP, tool reports).
- Modelling included and excluded.
- Number of revision rounds and council RFI responses included.
- Turnaround from complete drawings.
- Whether post-construction verification is included or quoted separately.
Warning signs to look out for
- Template reports that do not name your council’s policy or targets.
- Commitments that do not appear on the drawings.
- No modelling where the council requires it.
- Fees that exclude any RFI response.
- Reluctance to identify the assessor or their accreditations.
For context on what an ESD consultant is responsible for, see What does an ESD consultant do? above, and read about the Torple team.
Common ESD Report Mistakes and Council RFIs
QUICK ANSWER
The most common reasons councils issue ESD requests for information are late consultant engagement, performance claims without evidence, drawings that do not match the modelled inputs, missing council-specific criteria, vague material specifications, and omitted stormwater or transport commitments. Each is avoidable with early engagement and a compliance table tied to the drawings.
| Mistake | Consequence | Fix |
|---|---|---|
| Engaging the ESD consultant after lodgement | RFI, redesign, possible re-notification | Engage at concept design |
| Unsupported performance claims | Council rejects targets as unverified | Back every claim with a tool output or calculation |
| Drawings do not match modelled inputs | Inconsistency RFI; conditions to amend plans | Model the final drawing set and annotate plans |
| Missing council-specific criteria | Report assessed as incomplete | Build the report around the local policy's categories |
| Unverifiable material specifications | Condition requiring clarification before building approval | Specify products or performance values, not 'sustainable materials' |
| Omitted stormwater or transport commitments | RFI or onerous conditions | Include STORM or MUSIC results and bicycle or EV provisions |
Late engagement is the most expensive mistake because it turns cheap design decisions into costly changes. Unsupported claims are the most common: phrases like “energy-efficient lighting” without a lighting power density or specification are routinely rejected. Drawing mismatches happen when the architect revises glazing after modelling. Missing local criteria occur when a generic template is used across councils. The fix in every case is the same: early engagement, evidence for every commitment, and a compliance table tied to drawing references. For how councils score these categories, see our guide to SDA and SMP reports.
Frequently Asked Questions About ESD
What does ESD stand for?
ESD stands for Ecologically Sustainable Development. It is the Australian legal and policy term for development that uses, conserves and enhances resources so ecological processes are maintained and quality of life can improve now and in the future. In building design, ESD is also used for Environmentally Sustainable Design.
What is an ESD consultant?
An ESD consultant is a building sustainability specialist who assesses a development against council ESD policy and rating tools, then prepares the ESD report lodged with the development application. They advise architects and engineers on energy, water, materials, transport and indoor environment, and respond to council requests for information.
What are the four principles of ESD?
The four principles of ESD are the precautionary principle, intergenerational equity, conservation of biological diversity and ecological integrity, and improved valuation, pricing and incentive mechanisms. The EPBC Act 1999 adds a fifth, integration, requiring economic, environmental, social and equitable considerations to be weighed together in decision-making.
What is included in an ESD report?
An ESD report includes targets and design commitments for energy efficiency, water and stormwater, materials and waste, transport and indoor environment quality, supported by tool outputs such as BESS, STORM or NatHERS. It ends with a compliance table mapping each council requirement to an initiative, its evidence and a drawing reference.
Do I need an ESD report for my DA?
You need an ESD report if your council’s planning policy or a state instrument requires one, which is common for multi-dwelling residential, apartments, mixed-use, commercial and larger non-residential projects. Single houses in NSW usually need a BASIX certificate instead. Check with council or an ESD consultant before lodgement.
What is the difference between an ESD report and a Section J report?
An ESD report is a planning-stage document covering broad sustainability commitments against council policy. A Section J report is a building-approval document showing a commercial building complies with the energy efficiency requirements of NCC Volume One. Many commercial projects need both, at different stages.
How much does an ESD consultant cost in Australia?
An ESD report typically costs [A$1,500 to A$4,000] for small multi-dwelling projects, [A$4,000 to A$10,000] for medium apartment or mixed-use developments, and [A$10,000 or more] for large commercial projects needing modelling. Cost depends on scale, building class, council requirements, modelling and revision rounds.
How long does an ESD report take to prepare?
Most ESD reports take [5 to 15 business days] from receipt of complete drawings. Small projects can be faster; large projects with daylight or energy modelling take longer. Changing drawings after modelling and scattered review comments are the most common causes of delay.
Is an ESD report the same as a BASIX certificate?
No. A BASIX certificate is a mandatory NSW residential assessment of energy, water and thermal performance generated through an online tool. An ESD report is broader, covering materials, waste, transport, stormwater and indoor environment against council policy. NSW multi-residential projects often need both.
Who can prepare an ESD report in Australia?
There is no single national licence for ESD reports. They are usually prepared by ESD or sustainability consultants with relevant qualifications and tool accreditations, such as NatHERS, Green Star or NABERS. Some councils accept self-prepared assessments for small projects using their own tools, such as BESS.
Get Your ESD Report Right the First Time
An ESD report that is scoped early, evidenced properly and tied to the drawings is the difference between a clean approval and months of RFIs. Torple Enviro prepares ESD reports, SDAs and SMPs alongside Section J, NatHERS and BASIX, so every compliance document on your project tells the same story.